Description
* General information:
– All construction materials & tanks using SS400
– All construction and tank welding using the GMAW process
*Systems:
– Tsurumi pump Model TE5-50R
* Painting:
– Surface preparation : power tools cleaning
– Primer Coat using Epoxy Primer with a thickness of 60 – 70 Micron, gray color
– Top Coat using Marine Top coat with a thickness of 40 – 45 Micron, colt diesel yellow color
Project Details
Reviews
There are no reviews yet.